Caesar’s Entertainment Group / High Roller Observation Wheel

Primary support columns and wind/sizmic brace leg – installed on concrete footings with epoxy grout acting as the interface between the steel and concrete structures. Primary Support Columns were grouted with CWC 604. The Brace Leg was grouted with Escoweld 7505E. Wheel assembly structure with Escoweld 7505E. MST:Preliminary engineering review and product recommendations, installing, contractor…

Ivanpah Solar Generating Station

Foundation for all mechanical equipment for the solar thermal power plant collection towers for the largest solar thermal power plant in the world. MST supplied Chockfast Black, Chockfast Red High Flow, installation accessories, technical support, training, post-pour evaluations and field sampling for independent laboratory. MST Field Service: Product recommendations, installation accessories, on -site, field product…

Jet Propulsion Laboratory/NASA

Foundation restoration for the JPL, Goldstone Radio Telescope. Re-grout the main support for the main hydrostatic bearing soleplates replacement using an MST recommended leveling system (Level Master) and epoxy grout (CWC 604). MST was onsite for system design, technical over site, and grout sampling for independent laboratory testing. MST Field Service: Preliminary design evaluation and…