Las-Vegas-High-Roller-(10)Primary support columns and wind/sizmic brace leg – installed on concrete footings with epoxy grout acting as the interface between the steel and concrete structures. Primary Support Columns were grouted with CWC 604. The Brace Leg was grouted with Escoweld 7505E. Wheel assembly structure with Escoweld 7505E.

MST:Preliminary engineering review and product recommendations, installing, contractor training, product sampling and lab compressible strength testing.