Install ship’s main propulsion engines on Chockfast Orange epoxy chocks. Allows simple alignment repairs by removing old chocks, re-aligning machinery, and re-casting new chocks. Insulates operating temperatures from ships bedplate to hold precise alignment, and helps control corrosion problems relating to dissimilar metals. Over 18 billion running hours on Chockfast chocks around the world.
Problem: Safe and effective method of installing ships propulsion machinery to ships bedplates to maintain precise crankshaft and gearbox/propeller shaft alignment.
Solution: A two-component, pour-in-place, epoxy compound that allows ship machinery engineers to align critical components in a “Ready Run” state. Once satisfied with alignments, epoxy load-bearing chocks are installed to maintain the precise alignment.